Blue, Milsons Point
Works completed
Installing the steel for all levels of the new lifts, stair shafts, including the base and extension slabs. Column strengthening of existing columns, new slab on ground in basement 3 and all the extension balconies for the whole building. Columns, walls, stairs, upturns as well as PT slabs for the new levels on top of the existing building.